Activity | Small Project (2,500 lines of code) | Large Project (500,000 lines of code) |
---|---|---|
Architecture/design | 10% | 30% |
Detailed design | 20% | 20% |
Code/Debug | 25% | 10% |
Unit test | 20% | 5% |
Integration | 15% | 20% |
System test | 10% | 15% |
< Source : Adapted from Code Complete (McConnell 1993) >