| Activity | Small Project (2,500 lines of code) | Large Project (500,000 lines of code) |
|---|---|---|
| Architecture/design | 10% | 30% |
| Detailed design | 20% | 20% |
| Code/Debug | 25% | 10% |
| Unit test | 20% | 5% |
| Integration | 15% | 20% |
| System test | 10% | 15% |
< Source : Adapted from Code Complete (McConnell 1993) >